← All cases

[2018] NSWSC 1019

Rodriguez & Sons Pty Ltd v Queensland Bulk Water Supply Authority trading as Seqwater (No 15)

Parts of EXP.SEQ.003.0113 rejected and tender of SEQ.004.036.7950, SEQ.004.036.8522 and SEQ.004.036.7520 rejected

Catchwords

EXPERT REPORT – assessment of reasonableness of flood engineer’s belief about capacity of dam – reliance on events that post-date flood event – opinion with absence of reasoning – no question of principle

Cases cited

  • Dasreef Pty Ltd v Hawchar (2011) 243 CLR 588;[2011] HCA 21
  • Rodriguez & Sons Pty Ltd v Queensland Bulk Water Supply Authority trading as Seqwater (No 9)[2017] NSWSC 1116
  • Rodriguez & Sons Pty Ltd v Queensland Bulk Water Supply Authority trading as Seqwater (No 10)[2018] NSWSC 149
  • Vairy v Wyong Shire Council[2005] HCA 62; 223 CLR 422

Judgment

  1. [1]

    On 14 June 2018, I heard argument in respect of various objections raised by Senior Counsel for the plaintiff, Mr Owens SC, to the tender by the first defendant, Queensland Bulk Water Supply t/a Seqwater (“Seqwater”), of substantial parts of a report [1] prepared by Mr Christopher Dann, concerning Somerset Dam. Mr Dann is a civil engineer with particular knowledge of the structural safety of dams.

  2. [2]

    In broad terms there were three categories of objections to Mr Dann’s report. First, the plaintiff objected to so much of Mr Dann’s report that describes the undertaking and outcome of a risk assessment of the failure of Somerset Dam undertaken after January 2011, being a “Portfolio Risk Assessment” undertaken by Mr Dann’s firm URS Australia Pty Ltd of all of Seqwater’s dams including Somerset Dam in 2013 (the “PRA 2013”) [2] and a consequential report undertaken in 2014 by his firm concerning Somerset Dam (“URS 2014”). [3] The Plaintiff also objected to the tender of those reports.

  3. [3]

    Second, the plaintiff contended that the bulk of the remainder of Mr Dann’s report which concerned the structural capacity of Somerset Dam included material the subject of the first category of objection and the material could not be separated such that the whole report should be rejected.

  4. [4]

    Third, the plaintiff objected to certain parts of Mr Dann’s reports which concerned whether “precautionary releases”, that is releases of water from Wivenhoe Dam in advance of forecast rain falling, were permissible under the version of the “Manual of Operational Procedure for Flood Mitigation at Wivenhoe Dam and Somerset Dam” relevant to dam operations in January 2011 (the “Manual”). [4]

  5. [5]

    At the conclusion of oral argument on the first category of objection I upheld the first objection and stated I would provide reasons later. [5] I did not uphold the second objection [6] and proceeded to accept and reject the tender of various parts of the report that reflected the ruling in respect of the first category of objection. I upheld the third objection. [7] This judgment constitutes my reasons for upholding the first and third objections.

Background

  1. [6]

    Somerset Dam has four regulator valves, eight sluice gates and eight crest gates. The regulator valves and sluice gates allow for a discharge of water from towards the bottom levels of the dam which has an elevation level of 60.96m Australian Height Datum (“AHD”). The spillway fixed crest level which is at the bottom of the crest gates has an elevation level of 100.45m AHD. The point of the dam adjacent to the top of the crest gates is known as the crest level. It has an elevation level of 107.46m AHD. The top of Somerset Dam’s deck has an elevation level of 112.34m AHD.

  2. [7]

    Section 9.2 of the Manual specifies that once a flood event is declared all of Somerset Dam’s crest gates are to be fully opened and all of the sluice gates and regulator valves are to be closed. Various parts of the Manual specify flood strategies for Somerset Dam that, at least in some circumstances, required the crest gates to remain open during a flood event. The defendants contend that they can, or at least should, never be opened during a flood event. When the crest gates are opened then uncontrolled discharge will occur for water stored above 100.45m AHD subject to whatever control can be exercised by releases from the sluice gates and regulator valves.

  3. [8]

    In describing flood event Strategy S2 for Somerset Dam, the Manual states, inter alia (at p 41):

  4. [9]

    The fact that the crest level is 107.46m AHD but that the likely failure level of Somerset Dam is 109.70m AHD reflects the fact that the Manual contemplates the possibility of Somerset Dam being “overtopped”, that is its water level being above 107.45m AHD. In that regard, section 10.2 of the Manual states (at p 44):

  5. [10]

    I have described the scope of the evidence of the plaintiff’s expert on dam operations, Dr Ronald Christensen, in previous judgments: see Rodriguez & Sons Pty Ltd v Queensland Bulk Water Supply Authority trading as Seqwater (No 9) [2017] NSWSC 1116; Rodriguez & Sons Pty Ltd v Queensland Bulk Water Supply Authority trading as Seqwater (No 10) [2018] NSWSC 149. Dr Christensen has produced a number of simulations which form the basis for the actions that the plaintiff contends a reasonably competent flood engineer should have undertaken in conducting flood operations at Wivenhoe Dam and Somerset Dam during the period 2 January to 12 January 2011. The simulations adopt different start dates for flood operations and have different operating assumptions which are unnecessary to describe.

  6. [11]

    There are numerous aspects of Dr Christensen’s simulations that are contentious but two in particular are of present relevance. First, two of the simulations assume that under some circumstances the crest gates at Somerset Dam can be closed during a flood event, being Simulation I and Simulation J. In Simulation I, the water level in Somerset Dam rises to 106.95m AHD. [8] In Simulation J the water level in Somerset Dam rises to 106.93m AHD. [9] Second, the remainder of the simulations do not close the crest gates at Somerset Dam however they take the water level in Somerset Dam higher than the level it actually reached in January 2011 namely 105.11m AHD. For example, both Simulation F and Simulation H take the water level in Somerset Dam to a height of 106.25m AHD. [10]

First Category of Objection to Mr Dann’s evidence: the PRA 2013 and the URS 2014

  1. [12]

    Mr Dann’s letter of instruction asked him to agree or disagree with certain statements made in Dr Christensen’s reports concerning the operation of Somerset Dam and then to address the following questions: [11]

  2. [13]

    Mr Dann was instructed that he was entitled to consider information and material obtained as part of his previous retainers with Seqwater, which thus included the PRA 2103 and the URS 2014 provided he clearly identify the information relied on. He was also asked to state whether or not his knowledge of any of the matters covered in his report had been identified before the January 2011 flood event.

  3. [14]

    In his report Mr Dann describes, amongst other matters, the process of revised risk assessment of Somerset Dam that was undertaken as part of PRA 2013 and the URS 2014. As part of this a new potential “failure mode” was identified namely an “assessed increased erosion potential of the rock foundations when flows start to pass over the non-overflow sections of the dam at EL107.46.” [12] Mr Dann relevantly concluded:

  4. [15]

    Thus, the effect of the studies was in effect a revision of what the Manual contemplated namely a potential to operate Somerset Dam by overtopping it at 107.46m AHD but not allowing it to exceed 109.70m AHD. This conclusion appears to have been in part based on a further engineering assessment and in part based upon a revised approach to risk analysis.

  5. [16]

    Seqwater did not contend that this aspect of Mr Dann’s evidence was relevant to any causation analysis of Dr Christensen’s simulations. [14] As noted, this material only suggests that Somerset Dam should not be overtopped and Dr Christensen does not overtop Somerset Dam in any of his simulations. In other words, this material does not support a suggestion that, had any of the flood engineers adopted Dr Christensen’s approach, then Somerset Dam would, or even might, have collapsed.

  6. [17]

    Instead, Senior Counsel for Seqwater, Mr Pomerenke QC, contended that this material addressed the question of breach of duty. He contended that the evidence suggested that in January 2011 the flood engineers acted on the basis that there was a level of risk in operating Somerset Dam above 107.46m AHD, and below that if the crest gates were closed, that was not properly recognised by the Manual or by Dr Christensen in his simulations and this material served to demonstrate that the engineers’ belief was “real and not fanciful”. [15] If accepted this might tend to negate any suggestion that a reasonably competent flood engineer would take Somerset Dam as high as Dr Christensen did in his simulations.

  7. [18]

    Mr Owens SC contended that none of the engineers who had given evidence prior to 14 June 2018 had expressed a belief in the terms submitted by Mr Pomerenke QC. However, even if they had, Mr Owens SC submitted that the reasonableness of any belief held by any of the flood engineers in January 2011 concerning the maximum height at which Somerset Dam could be operated with or without its crest gates open could “only be determined by reference to the factual material that was available [to them] at the time”. [16]

  8. [19]

    In circumstances where the evidence of only two of the four flood engineers was complete and where it appears that much of their evidence is contested, I determined this objection on the assumption that Mr Pomerenke QC correctly characterised the belief that at least one flood engineer held about the risks of operating Somerset Dam at elevated levels with and without the crest gates closed. However, as noted, this material is only relevant to an assessment of breach and such an inquiry is prospective in that it “seek[s] to identify what the response would have been by a person looking forward at the prospect of the risk of injury" (Vairy v Wyong Shire Council [2005] HCA 62; 223 CLR 422 at [126] per Hayne J). An assessment of whether any actions or omissions of the flood engineers in January 2011 informed by any belief they held about the maximum operating level of Somerset Dam breached any duty of care they owed must be undertaken prospectively and not by reference to matters they were unaware of and could not reasonably be expected to have been aware of at that time. The PRA 2013 and URS 2014 were such matters. The same applies to any assessment of Dr Christensen’s evidence and simulations.

  9. [20]

    It was for that reason that I rejected so much of Mr Dann’s report that address the risks associated with the operation of Somerset Dam by reference to studies and assessments undertaken after the flood event in January 2011.

Third Category of Objection to Mr Dann’s Evidence: Precautionary Releases

  1. [21]

    In section 8.3 of his report Mr Dann stated: [17]

  2. [22]

    There is no doubt that an assessment of the obligations imposed on the flood engineers by the Manual is a hotly contested issue in these proceedings. To give evidence on that topic it must be demonstrated that Mr Dann had “specialised knowledge based on his training, study or experience” and that the opinions he expresses are “wholly or substantially based on that knowledge” (see Dasreef Pty Ltd v Hawchar (2011) 243 CLR 588; [2011] HCA 21 at [35]). It may be that a civil engineer in Mr Dann’s position is capable of bringing expertise to bear upon a determination of what the Manual required of the flood engineers. However, the absence of any substantive reasoning in Mr Dann’s report to support the above conclusions left me unsatisfied that the conclusions he expressed were “wholly or substantially based on that knowledge”.

  3. [23]

    Accordingly I rejected the above passage in Mr Dann’s report (and its equivalents elsewhere).

Unofficial copy. Source: NSW Caselaw. Refer to the official version for authoritative text.